Skip to main content

Engage - ECO

· One min read

Operation and order details now include a link to engineering change orders for the part being produced. To show the information, use the ECO action button if it is displayed:

engage_eco

The information shown includes the description, actions and other information about the change order:

engage_eco_details

If the part has more than one engineering change order, use the < and > buttons at the bottom to scroll through them.